Two Concurrent International Conference & Exhibition on
29-30 January 2018, Holiday Inn Hotel, Mumbai
Conference
Submit Abstracts for Oral / Poster Papers Presentation:
Technical Committee invites authors to submit technical papers on specified technical topics for Oral Presentation or Poster Paper during conference. Authors are requested to submit abstracts not exceeding 300 words and as per the guidelines.
Please send your abstract to:
info@oilandgasclub.com / events@oilandgasclub.com
Delegate Registration:
Kindly send your nomination/ participation details to:
info@oilandgasclub.com / events@oilandgasclub.com
Category | Fee |
---|---|
Speaker/Author | Rs. 10,000/- (USD 200) |
Delegate/Co-author | Rs. 17,000/- (USD 340) |
Educational Institute/Universities | Rs. 12,000/- (USD 240) |
Student/Spouses | Rs. 4,000/- (USD 80) |
18% GST will be applicable as extra.
Corporate discount:
- 10% additional discount if 3 & above nos. of del. participated from same organization.
- 15% additional discount if 6 & above nos. of del. participated from same organization.
Pipeline Integrity Management Theme Topics:
Pipeline Integrity, Safety and Reliability Management
- Risk Analysis, Latest techniques in Pipelines Risk Management
- Environmental Risks/ Geo-hazards / Natural Disasters
- Strategic Analysis and Planning of Pipeline Assets
- Health Safety and Environment (HSE)
- Trends in pilferage prevention & detection (theft/monitoring/ detection & monitoring)
- Oil Spillage and Environmental Issues
Planning, Design and Construction of pipeline
- Onshore and Offshore Construction
- Production pipelines, Flow lines& Cross country Pipelines
- Design Constraint & Project Management
- System Planning, Hydraulics & Surge Analysis
- Compressors, Pump Stations, Valves & Pipeline Supports
- Pipeline Integrity Measures at Design & Construction stage
- Product Pipelines, Water Pipelines, Slurry Pipelines
- Deep water production facilities & under water Pipelines
- Application of Codes & Standards
Pipeline Materials, various issues in Pipeline Welding, Fabrication & Repair
- Best Practices for Pipeline Material Selection, Coated Pipeline, CRA’s
- Line Pipe Material design and Exploring New Materials
- Development and application of nonmetallic materials in pipeline
- Pipe Manufacture, Fittings, Supports, Quality Testing’s
- Pipeline Welding, Automatic and semi automatic welding, Electrodes, Heat Treatment
- Managing Cracks and Weld Anomalies in Pipelines, Weld Flaw Acceptance Criteria
- Hot Tapping
Corrosion Control & Management
- Types & Overview of Corrosion Risk for Pipelines
- Internal & External corrosion of pipelines, Pipeline Structural Corrosion & related failures
- Pipeline Coatings, Linings and Wrappings
- Cathodic /Anodic Protection
- Chemical Injections /Inhibitors
- Corrosion Monitoring & Inspection
- Microbiological Corrosion, Stress-Corrosion Cracking in Pipelines
Latest Inspection Techniques in Pipelines Risk Management
- Pipeline inspection- new possibilities / technologies
- Pipeline Pigging and In-Line Inspection
- NDT, Current trends & advanced techniques
- Cathodic Protection Survey & Coating Survey
- Pipeline Health Assessment – a Risk Based Approach
- Inspection of Un-Piggable Pipelines, Direct Assessment ECDA/ ICDA
- Field and Inspection Data Management, Geographical Information Systems
- Development of Robotics Technology, Theft & Burglary prevention
Operation, Maintenance Repair & Rehabilitation of Aging Pipelines
- Assessment of Health, Remaining Life Assessment (RLA)
- Leak Detection, Management & Maintenance Techniques
- Life Cycle Extension Strategies
- Pipeline Repair Methods, Clamping & Wrapping
- Hot Tapping, & In-Service Welding
- Pipeline automation & Measurement
- SCADA Systems, Monitoring / Surveillance
Challenges and Development in Offshore & Deep Water Pipeline
- Opportunities & challenges in Offshore & Deep water Pipeline
- Cross Country Pipelines
- Technological Developments & Solutions
- Inspection & Corrosion Control Measures
Panel Discussion:
- Topic 1 Pipeline Integrity Management for Deepwater & subsea pipelines
- Topic 2 Magnetic ILI vs UT ILI- Technical Development & Application
OMIC Gas Theme Topics:
Challenges, Developments & Opportunities in Natural Gas Industry
- India’s Gas Potential, Resources and challenges to accelerate Domestic production
- City Gas Distribution Market Key Trends & Opportunities
- LNG Technology Advances and Challenges, Long term outlook for LNG and natural gas
- Gas & LNG Infrastructure, Sustainable / green pipeline projects, Laying of Pipeline
- Importance of Gas in Power Generation, Opportunities: Fertilizer, Power & Industrial sectors
- Regulatory and technological solutions
- Carbon Footprints/ Environmental considerations
Integrated Operations & Maintenance Solutions for CGD/ PNG Distribution Networks
- CNG & PNG pipeline networks, Operation & Maintenance Aspects
- O&M of Oil & Gas Gathering Stations, Gas Compressor Stations, Offsite & Plant Equipment’s, Plants Utilities and CNG Re-fueling Stations
- Preventive & Predictive maintenance of Equipment & Instruments, CNG Compressors
- GIS based asset Management system, Control Room Management
- Emergency Response, Relief & Control Valves, Pressure Regulators, Isolation Schemes
Integrated Operations & Maintenance Solutions for LNG
- LNG technology advances and challenges, Safety aspects of LNG design and operation
- Gas Liquefaction, Shipping & Transportation, Regasification & Distribution, Pipeline
- Design and integration aspects of gas pre-treatment requirements, liquefaction plants and marine facilities, processes and licencors, Equipment & Solutions for LNG
- LNG import facility infrastructure options – onshore, FSRU, development of small LNG carriers and barges
- LNG bunkering: Technical & Operational issues
- LNG shipbuilding technology, Cryogenic technology for LNG terminals
- Real-time Service Excellence (RTSE)
Corrosion Control & Management
- Cathodic Protection (CP) system Design, Monitoring, Maintenance and rectification
- Internal & External Coating
- Corrosion Monitoring Systems
- Material of construction of Gas & LNG Equipment’s, Piping & Pipeline
- Cryogenic Application, Double wall Tank system, Exchangers, Compressors
- Welding & Fabrications Aspects
Inspection, Preventive Maintenance, Leak Detection & Integrity Management
- Testing & Commissioning, Inspection & Certification of CGD Networks
- Field inspections during network construction
- Integrity management, Case histories & failure analysis
- Maintenance Techniques, leak repair etc
- Safety & Risk management, Safety regulations and practices
- Odorization of PNG & CNG- Leakage Detection
- Key technologies for asset management (GIS, SCADA, ERP, etc.)
- Geographic Information System (GIS)
Exhibition
Stalls & Exhibition Charges:
Stall Options | 6 sq. m (3 x 2) | 4 sq. m (2×2) | Table Top |
---|---|---|---|
Benefits at a Glance | 80,000/-(USD 1600) | 60,000/-(USD 1200) | 35,000/-(USD 700) |
Complimentary no of delegates | 2 | 2 | 1 |
Company Advertisement in Souvenir | 1 Page | 1 Page | 1 Page |
Logo in Back Stage Banner | Yes | Yes | Yes |
Display of company logo in Website | Yes | Yes | Yes |
Memento will be presented | Yes | Yes | – |
18% GST will be applicable as extra.
5% Early Bird Discount applicable, in case payment received before 15th Dec 2017.
Tentative Floor Plan:
Supports & Branding:
Category | Platinum | Gold | Silver |
---|---|---|---|
Benefits at a Glance | 3,00,000/-(USD 6000) | 2,00,000/-(USD 4000) | 1,20,000/-(USD 2400) |
Complimentary exhibition booth | 8 sq. m (4 X 2) | 8 sq. m (4X 2) | 6 sq. m (3 X 2) |
Complimentary no of delegates | 8 | 6 | 4 |
Special Technical Representation of the Products/ Services (15 min.) of your company | Yes | Yes | – |
Representative at the Dias (Session Chair/ Panelist) | Yes (Both Days) | Yes | Yes |
Sharing of Participant Contact List | Yes | Yes | Yes |
1 Page Advt. & 1 Page Company Profile in Souvenir | Yes | Yes | Yes |
Wide publicity of logo and banner | Yes | Yes | Yes |
Display of Company logo in conference website | Yes | Yes | Yes |
Memento Presented | Yes | Yes | Yes |
18% GST will be applicable as extra.
5% Early Bird Discount applicable, in case payment received before 15th Dec 2017
Conference Souvenir
AIM E-magazine (Conference Souvenir) will be published with details of participating companies, abstracts (presented during the Seminar), photographs etc. The magazine will feature advertisements from the industry and is of tremendous publicity & business value. The e-copy of the magazine is going to have a significant number of free circulation (more than 92,000 worldwide) covering almost all the industry, service providers, contractors, supplier as well as end users. The advertisement charges are as follows:
Advertisement Charges | Fee |
---|---|
Outside Back Cover Page | Rs. 15,000/- (USD 300) |
Inside Front/ Back Cover Page | Rs. 12,000/- (USD 240) |
Double Spread Ad (2 page) | Rs. 12,000/- (USD 240) |
Full Page (Color) | Rs. 8,000/- (USD 160) |
Half Page (Color) | Rs. 5,000/- (USD 100) |
Fees mentioned in dollar ($) are applicable for Overseas Companies.
18% GST will be applicable as extra.
For advertisement technical specifications are:
Full page A4 Size: 7.75 in (w) x 11 in (h); With bleed: 8.25 (w) X 11.5 (h)
Half Page Size: 7.75 in (w) x 5.25 in (h); With bleed: 8.25 (w) x 5.75 (h)
Advertisement material should be High Resolution 300 dpi.
Color Mode-CMYK, Format- PDF, TIFF, JPEG.
