1) Plot plan:Arranging all plant units in a logical manner to take care of Material flow, statutory requirements, & good engineering Practices.
2) Equipment layouts:
Document showing layout of all equipment’s satisfying the Process requirements, safety & statutory Regulations, operability ease of maintenance & economy.
3) Piping layouts:
Document showing layouts of piping network to carry fluids From one equipment to another in a process plant satisfying The requirements as mentioned above.
4) Piping Material Specification (PMS):
Document Shows the Various Piping Material class is been used in pipe, Pipe Fittings etc in particular project.
About Oilandgasclub.com
Oilandgasclub.com is an international oil and gas (online & offline) conference technical training org from India. Oilandgasclub.com 3000+ professionals trained 150,000 hours of classes delivered 500+ expert trainers available and 3600+ respondents 30+ countries 80+ team. Blogs about technical tips at this blog. Contact or more about customized technical training from this page
70+ courses 7 venues 5 categories
OILANDGASCLUB.COM HAS PUBLISHED 150+ ARTICLES IN THIS BLOG Subscribe
Thanks for sharing this article.This is a very informative post.